Cannon Beach Water Resiliency Project Phase 2 - Water Line Replacement

Location Cannon Beach, OR (map)
Zone Zone 6 - Oregon Coast
Bid Date 07/31/2024 2:00 pm
Prebid Date 07/17/2024 10:00 am
Mandatory

Description

The project consists of the replacement of the City’s main water transmission main that feeds the City from the source. The pipeline work consists of open-cut and trenchless construction, an attached pipe replacement at the existing bridge crossing at Ecola Creek, bank stabilization at Ecola Creek, and trenchless installation methods near sensitive environmental areas. A fill station is included at the City’s maintenance yard to provide water in the case of a seismic emergency.

Join now to read more

Login     Benefits of Membership     Join Now

Want to see more? Login or join now to access these features:

  • Bid and Pre-Bid Dates
  • Bid Results
  • Daily Email Notifications
  • Latest Updates
  • Planholder Listings
  • Project Archives
  • Project File Downloads
  • Project Listings
  • Search by Project Name, City, Zone or Division
  • Watch Lists

We will continue adding new features in the future, and always welcome member feedback.