MWMC Switchgear and Transformation Project (P80115)

Location Springfield, OR (map)
Zone Zone 2 - Lane County
Bid Date 08/13/2024 2:00 pm
Prebid Date 07/31/2024 9:30 am
Mandatory

Description

Bids are invited for the following scope of Work for this Project: • Replacement of Primary Power Switching Station (PPSS) medium voltage switchgear at the MWMC Water Pollution Control Facility (WPCF). • Replacement of Willakenzie Primary Power Switching Station (WPPSS) medium voltage switchgear at the Willakenzie Pump Station, including procurement and installation of switchgear. • Replacement of seven (7) medium voltage transformers at the MWMC Water Pollution Control Facility (WPCF),...

Join now to read more

Login     Benefits of Membership     Join Now

Want to see more? Login or join now to access these features:

  • Bid and Pre-Bid Dates
  • Bid Results
  • Daily Email Notifications
  • Latest Updates
  • Planholder Listings
  • Project Archives
  • Project File Downloads
  • Project Listings
  • Search by Project Name, City, Zone or Division
  • Watch Lists

We will continue adding new features in the future, and always welcome member feedback.