Safe Routes to School Project

Location Mill City, OR (map)
Zone Zone 3 - North of Lane County
Bid Date 12/05/2024 3:00 pm
Prebid Date 11/18/2024 9:00 am

Description

The project generally includes installation of 830 linear feet of 12-inch Class 52 Cement Lined Ductile Iron Pipe (DIP) and associated appurtenances (i.e., valves, connections, etc.) within an existing public right-of-way, full depth pavement construction, construction of approximately 3,500 linear feet of new curb, gutter, Americans with Disability Act (ADA) crossings, and sidewalks of varying widths, construction of a stormwater planter, installation of new stormwater inlets, catch basins and...

Join now to read more

Login     Benefits of Membership     Join Now

Want to see more? Login or join now to access these features:

  • Bid and Pre-Bid Dates
  • Bid Results
  • Daily Email Notifications
  • Latest Updates
  • Planholder Listings
  • Project Archives
  • Project File Downloads
  • Project Listings
  • Search by Project Name, City, Zone or Division
  • Watch Lists

We will continue adding new features in the future, and always welcome member feedback.