Aquatic Center - Boiler Replacement/Rehabilitation
Location | Dallas, OR (map) |
Zone | Zone 3 - North of Lane County |
Bid Date | 12/11/2024 2:00 pm |
Description
This Scope of Work outlines two strategic options for addressing the current condition of the backup boiler at the Dallas Aquatic Center, which is currently non-operational due to a compromised heat exchanger and has incurred an operational violation from the State. The first option involves replacing the heat exchanger and associated supporting components. The second option entails a complete boiler replacement with a model better suited to the facility’s specific environment and workload.Join now to read more
Login
Benefits of Membership
Join Now
Want to see more? Login or join now to access these features:
- Bid and Pre-Bid Dates
- Bid Results
- Daily Email Notifications
- Latest Updates
- Planholder Listings
- Project Archives
- Project File Downloads
- Project Listings
- Search by Project Name, City, Zone or Division
- Watch Lists
We will continue adding new features in the future, and always welcome member feedback.